Electrical power system outlook and transmission challenges for supplying large loads

Thursday, April 24, 2025

Time
03:30 pm - 04:30 pm
Hall
Auditorium 1

Discussion on the impact of non-dispatchable sources on the operation of the electrical system. Evaluation of the capacity of the transmission system in the NE to connect hydrogen production plants.

03:30 pm - 04:30 pmElectrical power system outlook and transmission challenges for supplying large loads

Service Menu
You are using an outdated browser

The website cannot be viewed in this browser. Please open the website in an up-to-date browser such as Edge, Chrome, Firefox, or Safari.